Planning checklist, not an EPC assessment

Sequence energy improvements before spending.

Record the home, select possible measures and replace the editable example figures with quotations and property-specific estimates.

01

Home and target

No score uplift is calculated or promised.

Possible measures and editable planning figures
Investigate damp, roof and ventilation before covering fabric.
Clear loft; maintain eaves ventilation and safe electrical clearances.
Survey wall construction, moisture risk, detailing and permissions.
Check compatibility with the existing heating system.
Heat-loss survey, emitters, hot-water storage and electrical supply first.
Roof condition, shading, structure, wiring and permissions first.

Suggested planning sequence

Selected measures in dependency-aware order
OrderMeasureEntered costEntered savingDependency / disruption warning
1Repair defects and assess ventilation£500£0Investigate damp, roof and ventilation before covering fabric.
2Loft insulation£1,200£180Clear loft; maintain eaves ventilation and safe electrical clearances.
4Heating controls£650£110Check compatibility with the existing heating system.

Plan fabric, ventilation and heating together

Insulation and draught work can change ventilation needs. Heating changes should follow a heat-loss assessment, and solar or battery work may depend on roof condition, electrical capacity, permissions and export arrangements. Flats, listed buildings and traditional construction can need specialist consent and moisture-aware design.

What to verify

  • Ask an accredited domestic energy assessor what evidence and modelling apply to the home.
  • Use competent installers and property-specific surveys and quotations.
  • Check current grant eligibility directly; schemes, dates and household rules change.
  • Do not treat a simple payback ratio as a guarantee: behaviour, weather, tariffs and performance vary.

Official starting points: find an EPC and GOV.UK energy-efficiency guidance. Reviewed 15 August 2026.